Page 1 of 1
little problem with Project Timeline
Posted: 24 May 2011, 16:20
by sandriko
hi
i just wanted film duration to be shown in min/sec instead of frames in project timeline..
i`ve searched alot but without any result
maybe some of you know about it smth?
thx!
sandriko
Re: little problem with Project Timeline
Posted: 24 May 2011, 17:27
by Paul Fierlinger
That would then be Time Code. To switch from Frame to Time Code, go to the extreme left bottom of the Layer Panel.
Re: little problem with Project Timeline
Posted: 24 May 2011, 17:58
by ZigOtto
you can also assign a hotkey to [Layer: Toggle Frames/Time Code] command, via the Preferences/ShortCuts/Configure panel .
Re: little problem with Project Timeline
Posted: 25 May 2011, 07:58
by sandriko
ooh thank you so much, sometimes i`m getting a bit confused about all these buttons around.
buti don`t think that it`ll be necessary to assign it to hotkey cause it isn`t everyday hotkey tool (for me)
thank you very much!
Re: little problem with Project Timeline
Posted: 01 Nov 2012, 16:15
by Retablez
I am looking for that switch on TVP 10, but I can't find it in the place you describe. To my knowledge, it seems that timecode can be activated or deactivated on the preferences panel.
Re: little problem with Project Timeline
Posted: 01 Nov 2012, 16:29
by Paul Fierlinger
Unfortunately that switch in the bottom corner of the layer panel has been since removed -- the only way is to either create a custom button or assign a key for the command. I have a custom button made with this command:
Key: Timeline: Toggle Frames/Time code.